top of page

This big sumbitch is called, The Beast. Its Doyon's new Rig 26 being rigged up in Alpine Fld. on the North Slope of Alaska for Conoco Phillips and it set to spud its first well any day now, April 2020.


Its got the hook-load capacity and pump yard to reach out and touch something at 35,000 feet TMD.


Rig floor and top drive.

Above photo and below video; test RU/RD in Alberta before being trucked to the North Slope...240 loads.


bottom of page