top of page

Please click 'vimeo' on the window for optimum video resolution.

Job: pre-packing perforated interval inside 5 1/2 in. 23 lb.ft. production casing prior to screen and liner backoff, use of X-over gravel pack tool and eventual packer isolation; MCA Petroleum Corporation, Standard Trust #15, Southwest Muldoon Field; Fayette County, Texas, 2016.


bottom of page